Conclusion: To avoid significant health hazards associated with spent shells from the former police shooting range, implementation of Mitigation Measure 4.G-2i will be required.

Mitigation

Mitigation Measure 4.G-2i: Prior to any construction of trails on the southerly slope of Icehouse Hill, best management practices for lead removal consistent with United States Environmental Protection Agency Circular EPA-902-B-01-001, Best Management Practices for Lead at Outdoor Shooting Ranges, Revised June 2005, shall be implemented.

Conclusion with Mitigation: With implementation of Mitigation Measure 4.G-2i, lead hazard impacts from remaining spent shells from the former police shooting range would be reduced to less than significant.

Bayshore Industrial Park. To address issues related to previous uses within the Bayshore Industrial Park, the following text is added following the conclusion at the bottom of page 4.G-98.

Bayshore Industrial Park
The Bayshore Industrial Park consists of a series of metal building used for various industrial and service commercial purposes, such as warehousing/storage and auto repair. Based on the age of these buildings, there is a potential for the presence of asbestos and lead-based paint, as well as the potential for ground contamination undetected as part of previous studies within OU-2. The existing industrial park is planned for demolition to make way for new planned uses under each of the four development scenarios. Such demolition could result in the introduction of asbestos and lead-based paint, as well as potential other contaminants in the soils into the environment.

Conclusion: To avoid significant health hazards associated the Bayshore Industrial Park, implementation of Mitigation Measure 4.G-2j will be required.

Mitigation

Mitigation Measure 4.G-2j: Prior to approval of any demolition plan within the Bayshore Industrial Park, any building(s) proposed for demolition shall be tested for asbestos and lead-based paint. Should asbestos or lead-based paint be identified, the affected building(s) shall be remediated to the satisfaction of the RWQCB pursuant to the most current regulatory standards in effect at the time of remediation. Prior to site development within the Bayshore