OSEC-267
[See page
5-346 for the original comment]
As
stated
in
Mitigation
Measure
4.H-4b,
no
building
permits
will
be
issued
unless
the
site-specific
development
plan
for
such
building
provides
for
such
systemwide
improvements
as
are
necessary
to
provide
adequate
flood
protection
as
specified
in
the
mitigation
measure.
While
construction
of
the
overall
drainage
systems
may
be
phased,
phased
development
of
infrastructure
must
be
consistent
with
the
phasing
plan
required
by
General
Plan
Policy
337.
The
performance
standards
set
forth
in
Mitigation
Measure
4.H-4b
to
ensure
adequate
conveyance
capacity
in
the
storm
drain
system
will
be
required
to
be
met
throughout
the
phased
development
of
the
drainage
system.
See
Chapter
4.0,
Mitigation
Monitoring
and
Reporting
Program
,
for
the
specific
implementation
requirements
for
Mitigation
Measure
4.H-4b.
As
noted
in
Draft
EIR
Table
4.I-1,
General
Plan
Policy
337
requires
development
within
Baylands
to
include
“a
phasing
schedule
for
development
to
limit
the
adverse
impacts
of
too
rapid
growth.”
Table
4.I-1
notes
that
the
DSP
and
DSP-V
scenarios
are
inconsistent
with
this
policy
since
the
proposed
Brisbane
Baylands
Specific
Plan
“does
not
tie
the
rate
of
land
development
to
the
availability
of
infrastructure,
which
could
lead
to
the
establishment
of
new
uses
outstripping
the
capacity
of
infrastructure
during
initial
phases
of
development
prior
to
project
buildout.”
Unless
the
City
modifies
or
removes
Policy
337
from
the
General
Plan,
any
specific
plan
approved
within
the
Baylands
will
be
required
to
establish
requirements
and
performance
standards
tying
the
pace
of
land
development
to
the
availability
of
services,
facilities,
and
infrastructure,
including
the
roadway
and
interchange
improvements
related
to
the
Bi-County
Program
pursuant
to
the
provisions
of
Draft
EIR
Mitigation
Measure
4.I-1.
As
part
of
the
planning
review
for
each
site-specific
development
project,
proposed
development
will
be
reviewed
to
determine
the
specific
requirements
needed
to
ensure
project
compatibility.
OSEC-268
[See page
5-346 for the original comment]
Mitigation
Measure
4H-4c
states
that
Visitacion
Creek
is
to
be
extended
west
of
Tunnel
Avenue
to
the
Roundhouse
building
area,
but
does
not
identify
a
specific
alignment.
The
specific
alignment
of
Visitacion
Creek
will
be
subject
to
all
requirements
set
forth
in
applicable
remedial
action
plans
and
EIR
mitigation
measures.
[See page
5-346 for the original comment]
The
specific
timing
for
implementation
of
Mitigation
Measure
4.C-4c
will
be
determined
by
the
required
development
phasing
plan
to
ensure
that
adequate
conveyance
capacity
is
available
throughout
the
phased
development
of
the
Baylands.
Drainage
improvements
are
to
be
provided
concurrent
with
site-specific
development
and
completed
prior
to
issuance
of
a
certificate
of
occupancy.
See
Chapter
4.0,
Mitigation
Monitoring
and
Reporting
Program
for
specific
requirements.
OSEC-269
Brisbane
Baylands
Final
EIR
2.9.3-87
May
2015
Previous Page | Next Page