3.
Revisions
to
the
Text
of
the
Draft
EIR
Appendices
(continued)
Volume
1
(continued)
B.
Brisbane
Baylands
Infrastructure
Plan
and
Select
Appendices
(continued)
Appendix
F:
Soil
Laboratory
Tests
2005
Investigation
Appendix
G:
Site-Specific
Seismic
Response
Analysis
(1997
UBC)
Appendix
H:
Lagoon
Way
Slope
Stability
Analysis
Appendix
I:
Data
Report
for
Four
Deep
Geotechnical
Borings
Appendix
J:
Evaluation
for
8
Million
Square
Foot
Building
Plan
Appendix
K:
Site-Specific
Seismic
Response
Analysis
(Title
27
of
CCR)
Volume
2
B.
Brisbane
Baylands
Infrastructure
Plan
and
Select
Appendices
(continued)
............B-1
B.2
Infrastructure
Plan
Appendix
F,
Preliminary
Geotechnical
Investigation
and
Recommendations
Report,
Brisbane
Landfill
(continued)
B.3
Infrastructure
Master
Plan
Appendix
G,
Preliminary
Geotechnical
Evaluation,
Brisbane
Baylands,
Former
Railyards
....................................
B.3-1
Regional
Geology
..............................................................................................
2
Subsurface
Conditions
.......................................................................................
3
Regional
Seismicity
and
Faulting
.......................................................................
5
Conclusions
and
Preliminary
Recommendations
..............................................
6
Seismic
Hazards
................................................................................................
7
Settlement
.........................................................................................................
8
Consolidation
Settlement
Mitigation
..................................................................
9
Fill
Setback
Distance
at
Railroad
.....................................................................
11
Slope
Stability
..................................................................................................
11
Soil
Improvement
.............................................................................................
12
Foundations
.....................................................................................................
12
Site
and
Subgrade
Preparation
.......................................................................
15
Fill
Placement
and
Compaction
.......................................................................
15
Underground
Utilities
.......................................................................................
16
Asphalt
Pavement
...........................................................................................
17
Portland
Cement
Concrete
Pavement
.............................................................
17
Seismic
Design
................................................................................................
18
Limitations
.......................................................................................................
18
Appendix
A:
Logs
of
Borings
by
Others
...............................................................
Appendix
B:
Laboratory
Test
Results
..................................................................
C.
Universal
Paragon
Corporation
Draft
Brisbane
Baylands
Specific
Plan
.................
C-1
Vision
and
Executive
Summary
...................................................................................
I
Introduction
.................................................................................................................
1
The
Planning
Area
....................................................................................................
21
Sustainability
Framework
..........................................................................................
29
Land
Use
and
Community
Design
............................................................................
41
Conservation
and
Open
Space
...............................................................................
129
Circulation
...............................................................................................................
159
Utilities
and
Services...............................................................................................
211
Implementation
.......................................................................................................
241
Public
Facilities
Financing
.......................................................................................
257
Appendix
A:
Brisbane
Baylands
Specific
Plan
/
General
Plan
Consistency
Analysis
............................................................................................................
269
Appendix
B:
Involvement
of
Other
Agencies
in
the
Baylands
.................................
293
Appendix
C:
Use
Classifications
Brisbane
Baylands
Specific
Plan
......................
299
Appendix
D:
Glossary
............................................................................................
307
Brisbane
Baylands
Final
EIR
3-5
May
2015
Previous Page | Next Page