3.
Revisions
to
the
Text
of
the
Draft
EIR
Appendices
(continued)
Volume
4
(continued)
L.
Water
Supply
Assessment
(continued)
....................................................................
L-1
Appendix
B:
Technical
Memo
prepared
by
Brown
and
Caldwell
Appendix
C:
2009
Water
Supply
Agreement
between
the
City
and
County
of
San
Francisco
and
the
Wholesale
Customers
in
Alameda,
San
Mateo,
and
Santa
Clara
County
Appendix
D:
BWD
Existing
Individual
Water
Supply
Contract
with
the
City
and
County
of
San
Francisco
Appendix
E:
GVMID
Existing
Individual
Water
Supply
Contract
with
the
City
and
County
of
San
Francisco
Appendix
F:
Term
Sheet
between
OID
and
the
City
of
Brisbane
Appendix
G:
CPP
and
CPP
V
Water
Demand
Calculations
Appendix
H:
2010
Urban
Water
Management
Plan
for
the
City
and
County
of
San
Francisco
M.
San
Francisco
Household
Hazardous
Waste
Collection
Facility
Operation
Plan
......
M-1
Purpose
of
the
Operations
Plan
..................................................................................
1
Program
Overview
and
Facility
Description
................................................................
1
Staffing/Medical
Monitoring/Training
...........................................................................
6
Waste
Acceptance
Guidelines
....................................................................................
7
Waste
Handling,
Packaging
and
Shipment
Procedures..............................................
9
Reuse
and
Recycling
................................................................................................
13
Facility
Signage
........................................................................................................
14
Payment
of
HHWCF
Disposal
Costs
........................................................................
15
Records/Reports/Audits
............................................................................................
15
Managing
Loadcheck
Waste
at
the
HHWCF
............................................................
19
Public
Education
and
Outreach
................................................................................
19
Financial
Responsibility
and
Liability
Insurance
........................................................
20
N.
Renewable
Energy
Feasibility
Study
......................................................................
N-1
Study
and
Site
Background
........................................................................................
1
Development
of
a
PV
System
on
Brownfields
.............................................................
3
PV
Systems
................................................................................................................
5
Proposed
Installation
Location
Information
...............................................................
13
Economics
and
Performance
....................................................................................
22
Conclusions
and
Recommendations
........................................................................
31
Appendix
A:
Assessment
and
Calculations
Assumptions
.........................................
32
Appendix
B:
Solar
Access
Measurements
................................................................
33
Appendix
C:
Results
of
the
JEDI
Model
....................................................................
34
Appendix
D:
Results
of
the
System
Advisor
Model
...................................................
38
Appendix
E:
Building
Energy
Modeling
.....................................................................
40
O.
Draft
Baylands
Public
Space
Master
Plan
..............................................................
O-1
Executive
Summary
....................................................................................................
1
Introduction
.................................................................................................................
4
Public
Space
Analysis
.................................................................................................
5
Public
Space
Plan
.....................................................................................................
15
Economics
................................................................................................................
28
Governance
..............................................................................................................
30
Conclusions
..............................................................................................................
31
Brisbane
Baylands
Final
EIR
3-8
May
2015
Previous Page | Next Page