Significant Impact Being Mitigated |
Mitigation Measure |
Responsibility for Implementation |
Enforcement Responsibility |
Monitoring Responsibility/ Frequency |
Actions Indicating Compliance |
Surface Water Hydrology and Water Quality (cont.) |
|||||
|
and construction permits. In addition to meeting the regulatory requirements for the SWPPP, the site- specific SWPPP shall include provisions for the minimization of sediment disturbance (i.e., production of turbidity) and release of chemicals to the Bay. |
|
|
The City Engineer shall maintain minimum monthly inspections during site grading activities. |
|
Compliance with water quality standards during construction DSP, DSP-V, CPP, & CPP-V scenarios |
4.H-1b: Prior to issuance of a grading permit, an applicant for any site specific development project to be constructed within the Project Site shall comply with any site-specific NPDES permit requirements for dewatering activities, as administered by the RWQCB. The RWQCB could require compliance with certain provisions in the permit, such as treatment of the flows prior to discharge, depending on the particular site conditions. Discharge of the groundwater generated during dewatering to the sanitary sewer or storm drain system shall only occur with authorization of and required permits from the applicable regulatory agencies, including the Bayshore Sanitary District or the |
Grading contractors |
City of Brisbane City Engineer |
Prior to issuing a grading permit, the City Engineer shall determine (1) any site- specific NPDES permit requirements for dewatering activities, as administered by the RWQCB and (2) that needed permits for discharge of groundwater generated during dewatering have been obtained. |
Approval of grading permits in compliance with any site- specific NPDES permit requirements for dewatering activities. |