Mitigation Monitoring and Reporting Matrix (continued)

 

 

Significant Impact Being Mitigated

 

Mitigation Measure

 

Responsibility for Implementation

 

Enforcement Responsibility

Monitoring Responsibility/ Frequency

 

Actions Indicating Compliance

Surface Water Hydrology and Water Quality (cont.)

Increase in the

4.H-4a: Prior to issuance of a building permit, all site-

Applicants for site-specific

City of Brisbane City

The City Community

Installation of drainage

amount of runoff and

specific development plans within the Project Site shall

development

Engineer

Development Director shall

improvements to the

potential flooding.

include systemwide drainage improvements that shall

prepare conditions of

satisfaction of the City

DSP, DSP-V, CPP, &

CPP-V scenarios

accommodate all increased runoff in accordance with City requirements and correct known existing deficiencies (e.g., Levinson Overflow Area and the

approval for all site specific development to require installation of such

Engineer.

PG&E property). On-site storm drainage collection

systemwide drainage

facilities shall be sized to convey the peak flow rate

improvements as are

from a 25-year storm event entirely within the piping

needed to accommodate

system such that Baylands roadways and recreational

increased runoff, achieve

facilities are not flooded. Drainage improvements shall

the performance standards

accommodate the 100-year peak storm event within

of Mitigation Measure 4.H-

the piping system and within streets such that building

4a, and correct known

finished floor elevations provide a minimum of 1-foot of

existing deficiencies to the

freeboard above the 100-year storm event hydraulic

satisfaction of the City

grade line water elevation with tidal flow and 100 years

Engineer in compliance.

of estimated sea level rise. Key roadways including

Sierra Point Parkway, Lagoon Road, and Tunnel

Avenue shall be designed such that these roadways

are available as evacuation routes in the event of a

100-year storm event. The proposed system design

shall be submitted to the City Engineer for approval

and shall hydraulically isolate existing drainage inlets

fronting Levinson Overflow Area and the PG&E

property from existing Brick Arch Sewer system.

Increase in the

4.H-4b: Prior to issuance of a building permit, all site-

Applicants for site-specific

City of Brisbane City

The City Community

Installation of new storm

amount of runoff and

specific development plans within the Project Site shall

development

Engineer

Development Director shall

drain facilities along

potential flooding.

include additional conveyance capacity by

prepare conditions of

Bayshore Boulevard north

DSP, DSP-V, CPP, &

CPP-V scenarios

incorporating new storm drain facilities along Bayshore Boulevard north of Industrial Avenue. Development plans shall also require addition of a new inlet near the

approval for site-specific development to require installation of new storm

of Industrial Way, including a new inlet near the Bayshore Boulevard and

Bayshore Boulevard and Industrial Way intersection

drain facilities along

Industrial Way intersection

that is large enough to intercept surface flows from

Bayshore Boulevard north

to intercept surface flows

Levinson Overflow Area and the PG&E property in

of Industrial Way, including

from Levinson Overflow

accordance with and as approved by the City. Review

a new inlet near the

Area and the PG&E

and approval by the City engineer shall be required to

Bayshore Boulevard and

property and provide

confirm that conveyance capacity is sufficient to

Industrial Way intersection

adequate conveyance

accommodate the 100-year peak storm event within

that is large enough to

capacity to the satisfaction

the piping system and streets such that building

intercept surface flows

of the City Engineer.

finished floor elevations provide a minimum of 1-foot of

from Levinson Overflow

freeboard above the 100-year storm event hydraulic

Area and the PG&E

grade line water elevation with tidal flow and 100 years

property to achieve the

of estimated sea level rise.

performance standards of