Mitigation Monitoring and Reporting Matrix (continued)

 

 

Significant Impact Being Mitigated

 

Mitigation Measure

 

Responsibility for Implementation

 

Enforcement Responsibility

Monitoring Responsibility/ Frequency

 

Actions Indicating Compliance

Noise and Vibration (cont.)

 

  • A listing of telephone numbers (during regular construction hours and off-hours);
  • Designation of an onsite construction complaint manager for Project site development;
  • Notification of neighbors within 300 feet of the Project site development construction area about the estimated duration of the pile-driving activity at least 30 days in advance of the activity; and
  • A preconstruction meeting with the job inspectors and the general contractor/onsite project manager to confirm that noise mitigation and practices (including construction hours, neighborhood notification, posted signs, etc.) are completed.

 

 

measures to respond to and track complaints pertaining to construction noise are in place.

The City’s Mitigation Monitoring Coordinator shall maintain a log of complaints and follow up activities as set forth in Sections 4.2 and 4.3 of this Mitigation Monitoring and Reporting Plan.

 

Public Services

Increased demand for police services

DSP, DSP-V, CPP, &

CPP-V scenarios

4.L-1: A site for a storefront substation that is easily visible and accessible to the general public and sized large enough to accommodate operations described in the Police Services and Facilities Plan shall be provided as required by the Brisbane Police Department.

Applicants for specific plan(s) shall include language in proposed specific plan(s) requiring provision of a storefront substation in compliance with Mitigation Measure 4.L- 1, including specifying that timing for provision of the substation.

Prior to approval of the first specific-specific development project within an adopted specific plan, the specific plan developer shall prepare a Police Services and Facilities Plan as required by the Brisbane Police Department to provide for adequate staffing and facilities to support Project site development.

Specific Plan(s): City Council

The City shall not adopt any specific plan that does not meet the requirements of Mitigation Measure 4.L-1.

The Community Development Department shall review specific plan(s) prior to public hearings to ensure provision of the required language.

Site-specific development projects shall not be approved until the required Police Services and Facilities Plan has been approved by the Brisbane Police Department.

Specific plan adoption incorporating the requirements of Mitigation Measure 4.L-1.