Significant Impact Being Mitigated |
Mitigation Measure |
Responsibility for Implementation |
Enforcement Responsibility |
Monitoring Responsibility/ Frequency |
Actions Indicating Compliance |
Energy Resources (cont.) |
|||||
|
the California Airborne Toxic Control Measure Title 13, Section 2485 of California Code of Regulations [CCR]);
|
|
The City Engineer shall not approve authorize commencement of infrastructure improvement construction without evidence that language is included in construction contracts and specifications to require implementation of the provisions of Mitigation Measure 4.P-1. |
|
|
Energy consumption. DSP, DSP-V, CPP, & CPP-V scenarios |
4.P-2a: All new buildings within the Project Site subject to the provisions of Brisbane Municipal Code Section 15.80 shall be required to achieve a LEED Gold rating, rather than the LEED Silver rating now required by the Municipal Code. In addition, all appliances installed within the Project Site as part of original building construction shall be ENERGY STAR rated or equivalent. |
Applicants for building permits subject to the provisions of Brisbane Municipal Code Section 15.80. |
City of Brisbane Building Official |
Review of building permit applications to ensure subject to the provisions of Brisbane Municipal Code Section 15.80 shall be required to achieve a LEED Gold rating. |
Approval of building permits for buildings subject to the provisions of Brisbane Municipal Code Section 15.80 meeting a LEED Gold rating. |
Energy consumption. DSP, DSP-V, CPP, & CPP-V scenarios |
Mitigation Measure 4.P-2b: All street and parking lot lighting within the Project Site shall be energy efficient light emitting diode (LED) based lighting, until a more efficient technology for street and parking lot lighting acceptable to the City of Brisbane becomes commercially available, at which time all street and parking lot lighting shall be the most energy efficient technology that is commercially available for street and parking lot lighting and that is also acceptable to the City of Brisbane. |
Applicants for infrastructure and/or site-specific development requiring provision of street and/or parking lot lighting. |
Street lighting: City Engineer Parking lot lighting: Community Development Director |
The City Engineer shall review street improvement plans to ensure provision of street lighting per Mitigation Measure 4.P-2b. Community Development Director shall review shall review site improvement plans to ensure provision of parking lot lighting per Mitigation Measure 4.P-2b. |
Approval of street improvement plans in compliance with Mitigation Measure 4.P-2b. Approval of site improvement plans in compliance with Mitigation Measure 4.P-2b. |