As a condition of approval for the first discretionary action taken for development within the Project Site, the applicant shall be required to initiate a corridor plan for Bayshore Boulevard in cooperation with Daly City and San Francisco to determine the suite of improvements necessary to resolve long-term cumulative traffic issues along the corridor. Because the effectiveness of such a corridor plan would necessitate participation by Daly City and San Francisco in recognition of increases in traffic along the Bayshore corridor that will be generated by future development within those two jurisdictions, Brisbane will also make its best efforts to assist the developer in securing the agreement of Daly City and San Francisco to participate in the corridor study and its implementation.

 

Page 4.N-117    BCC-662 [See page 5-280 for the original comment] REVISE Mitigation Measure 4.N-3b as follows:

 

Mitigation Measure 4.N-3b:8 At the signalized intersection of Old County Road & Bayshore Boulevard,9 the eastbound approach shall be restriped to create one additional exclusive through lane. In addition, the southbound approach shall be restriped to create two additional lanes: an added exclusive left-turn pocket and an added through lane for the southbound approach. Eastbound Tunnel Avenue shall be widened to the east of its existing alignment to accommodate two receiving lanes for the southbound left and eastbound through traffic. These improvements shall be constructed and accepted for public maintenance prior to issuance of occupancy permits for any site-specific development that would (1) result in reducing the intersection to below the acceptable LOS standard, or (2) contribute additional traffic to the intersection if it is already operating below the acceptable LOS standard completed prior to issuance of the first

 

 

Previous Page | Next Page