Significant Impact Being Mitigated |
Mitigation Measure |
Responsibility for Implementation |
Enforcement Responsibility |
Monitoring Responsibility/ Frequency |
Actions Indicating Compliance |
Air Quality (cont.) |
|||||
Generate cumulatively considerable construction emissions of criteria pollutants DSP, DSP-V, CPP, & CPP-V scenarios |
4.B-2b: All construction contract specifications shall include a requirement that off-road construction equipment used for site improvements shall be equipped with Tier 3 (Tier 2 if greater than 750 hp) diesel engines or better. All diesel generators used for project construction must meet Tier 4 emissions standards. If new emissions standards are adopted by U.S. EPA during project construction, construction contract specifications shall incorporate whichever standard is more stringent. |
Construction contractors for site-specific development |
The City Building Official shall not approve any building permit applications without evidence that the required language is included in construction contracts and specifications. The City Engineer shall not approve any grading permit or infrastructure improvements plan without evidence that the required language is included in construction contracts and specifications. |
The City Building Official shall be responsible for monitoring compliance on a minimum monthly basis during building construction. The City Engineer shall be responsible for monitoring compliance on a minimum monthly basis during grading and infrastructure construction. |
Approval of building, grading, and construction permits in compliance with Mitigation Measure 4.B-2a. |
Considerable net increase of criteria pollutants during operations DSP, DSP-V, CPP, & CPP-V scenarios |
4.B-4: The following measures identified in the 2012 BAAQMD CEQA Guidelines shall be implemented for site-specific development projects within the Project Site and shall be included, as applicable, into commercial leases, as well as Covenants, Codes, and Restrictions (CC&Rs) within the Project Site:
|
Businesses with 100 or more employees shall provide free transit passes (e.g., Clipper Card for use on Caltrain, San Francisco Municipal Railway [Muni], and SAMTrans) to employees as part of approved TDM programs. Site developers shall design parking areas with a minimum of 20 spaces for commercial and industrial uses to:
|
City of Brisbane Community Development Director |
The Community Development Director shall ensure that provisions i through vi of Mitigation Measure 4.B-4 are included in the Transportation Demand Management Program required by Mitigation Measure 4.N-13. The Community Development Director shall prepare a condition of approval for site-specific development that provisions vii through xiii of Mitigation Measure 4.B-4 shall be included into all commercial leases and CC&Rs. |
Approval of TDM program(s) meeting City and C/CAG requirements prior to issuance of occupancy permits. Approval of site-specific developments with conditions of approval requiring implementation of provisions vii through xiii of Mitigation Measure 4.B-4 to be included into all commercial leases and CC&Rs. |