Mitigation Monitoring and Reporting Matrix (continued)

 

 

Significant Impact Being Mitigated

 

Mitigation Measure

 

Responsibility for Implementation

 

Enforcement Responsibility

Monitoring Responsibility/ Frequency

 

Actions Indicating Compliance

Traffic and Circulation (cont.)

Increased traffic at

4.N-1b: The following physical improvements shall be

Baylands developer

City of Brisbane City

The City Engineer shall

Installation of the physical

intersections causing

constructed and accepted for public maintenance prior

Engineer

maintain annual traffic

improvements required by

them to operate

to issuance of occupancy permits for any site-specific

counts to monitor traffic

Mitigation Measure 4.N-1b.

below acceptable

development that would (1) result in reducing the

conditions, and shall

levels of service

intersection to below the acceptable LOS standard, or

provide for traffic analyses

Existing plus Project

(2) contribute additional traffic to the intersection if it is

of site-specific

conditions.

already operating below the acceptable LOS standard.

development proposals to

DSP, DSP-V, CPP, &

CPP-V scenarios

The intersection of Bayshore Boulevard and Old County Road shall be improved, including modifications to Tunnel Avenue to provide additional

determine when the requirements of Mitigation Measure 4.N-1b are to be

lanes and modify signal timing to improve intersection

applied.

operations to achieve, at a minimum, LOS C during both AM and PM peak hours under the DSP and DSP- V scenarios and ensure that LOS remains at LOS D or better under the CPP and CPP-V scenarios.

If the requirements of Mitigation Measure 4.N-1b are apply to the site- specific development, the

City Engineer shall inform

the City Building Official,

who shall not issue

occupancy permits for the

development until notified

by the City Engineer that

the required improvements

have been completed.

Increased traffic at

4.N-1c: The following physical improvements shall be

Baylands developer

City of Brisbane City

The City Engineer shall

Installation of the physical

intersections causing

constructed and accepted for public maintenance prior

Engineer

maintain annual traffic

improvements required by

them to operate

to issuance of occupancy permits for any site-specific

counts to monitor traffic

Mitigation Measure 4.N-1a

below acceptable

development that would (1) result in reducing the

conditions, and shall

or written confirmation from

levels of service

intersection to below the acceptable LOS standard, or

provide for traffic analyses

San Francisco that such

Existing plus Project

(2) contribute additional traffic to the intersection if it is

of site-specific development

improvements will not be

conditions.

already operating below the acceptable LOS standard.

proposals to determine

permitted to be constructed.

DSP, DSP-V, CPP, &

CPP-V scenarios

The intersection of Alana Way/Beatty Avenue/US 101 Southbound Ramps shall be signalized and longer green time shall be allowed for the eastbound/westbound traffic

when the requirements of Mitigation Measure 4.N-1c are to be applied.

than for the northbound/southbound traffic. In addition, the southbound (Alana Way) approach shall be restriped to provide an additional exclusive right-turn pocket, and the westbound (off-ramp) approach shall be restriped to provide an additional through lane to increase the capacity at the off-ramp.

If the requirements of Mitigation Measure 4.N-1c apply to a site-specific development, the City Engineer shall inform the City Building Official,

who shall not issue