Mitigation Monitoring and Reporting Matrix (continued)

 

 

Significant Impact Being Mitigated

 

Mitigation Measure

 

Responsibility for Implementation

 

Enforcement Responsibility

Monitoring Responsibility/ Frequency

 

Actions Indicating Compliance

Traffic and Circulation (cont.)

Increased traffic at

4.N-1d: The following physical improvements shall, to

Baylands developer

City of Brisbane City

The City Engineer shall

Installation of the physical

intersections causing

the extent permitted by agencies with jurisdiction over

Engineer

maintain annual traffic

improvements required by

them to operate

this intersection, be constructed and accepted for

counts to monitor traffic

Mitigation Measure 4.N-1d

below acceptable

public maintenance prior to issuance of occupancy

conditions, and shall

or written confirmation from

levels of service

permits for any site-specific development that would

provide for traffic analyses

San Francisco that such

Existing plus Project

(1) result in reducing the intersection to below the

of site-specific

improvements will not be

conditions.

acceptable LOS standard, or (2) contribute additional

development proposals to

permitted to be constructed.

DSP, DSP-V, CPP, &

CPP-V scenarios

traffic to the intersection if it is already operating below the acceptable LOS standard. The eastbound approach to the Alana Way/Harney Way/Thomas Mellon Drive

determine when the requirements of Mitigation Measure 4.N-1d are to be

intersection shall be restriped to provide an additional

applied.

right-turn lane. Harney Way shall be widened to the south of its existing alignment to accommodate this change.

If the requirements of Mitigation Measure 4.N-1d apply to a site-specific

development, the City

Engineer shall inform the

City Building Official, who

shall not issue occupancy

permits for the

development until notified

by the City Engineer that

the requirements of

Mitigation Measure 4.N-1d

have been satisfied.

Because the required

improvements are outside

of Brisbane, permission to

construct the

improvements called for in

Mitigation Measure 4.N-1d

must be secured from the

City and County of San

Francisco. The City

Engineer shall work with

the applicant to secure

such permission.

If San Francisco agrees to

the improvements called

for in Mitigation Measure

4.N-1d, the City Engineer

shall inform the Brisbane


Previous Page | Next Page