Significant Impact Being Mitigated |
Mitigation Measure |
Responsibility for Implementation |
Enforcement Responsibility |
Monitoring Responsibility/ Frequency |
Actions Indicating Compliance |
Traffic and Circulation (cont.) |
|||||
Increased traffic at |
4.N-1d: The following physical improvements shall, to |
Baylands developer |
City of Brisbane City |
The City Engineer shall |
Installation of the physical |
intersections causing |
the extent permitted by agencies with jurisdiction over |
Engineer |
maintain annual traffic |
improvements required by |
|
them to operate |
this intersection, be constructed and accepted for |
counts to monitor traffic |
Mitigation Measure 4.N-1d |
||
below acceptable |
public maintenance prior to issuance of occupancy |
conditions, and shall |
or written confirmation from |
||
levels of service |
permits for any site-specific development that would |
provide for traffic analyses |
San Francisco that such |
||
Existing plus Project |
(1) result in reducing the intersection to below the |
of site-specific |
improvements will not be |
||
conditions. |
acceptable LOS standard, or (2) contribute additional |
development proposals to |
permitted to be constructed. |
||
DSP, DSP-V, CPP, & CPP-V scenarios |
traffic to the intersection if it is already operating below the acceptable LOS standard. The eastbound approach to the Alana Way/Harney Way/Thomas Mellon Drive |
determine when the requirements of Mitigation Measure 4.N-1d are to be |
|||
intersection shall be restriped to provide an additional |
applied. |
||||
right-turn lane. Harney Way shall be widened to the south of its existing alignment to accommodate this change. |
If the requirements of Mitigation Measure 4.N-1d apply to a site-specific |
||||
development, the City |
|||||
Engineer shall inform the |
|||||
City Building Official, who |
|||||
shall not issue occupancy |
|||||
permits for the |
|||||
development until notified |
|||||
by the City Engineer that |
|||||
the requirements of |
|||||
Mitigation Measure 4.N-1d |
|||||
have been satisfied. |
|||||
Because the required |
|||||
improvements are outside |
|||||
of Brisbane, permission to |
|||||
construct the |
|||||
improvements called for in |
|||||
Mitigation Measure 4.N-1d |
|||||
must be secured from the |
|||||
City and County of San |
|||||
Francisco. The City |
|||||
Engineer shall work with |
|||||
the applicant to secure |
|||||
such permission. |
|||||
If San Francisco agrees to |
|||||
the improvements called |
|||||
for in Mitigation Measure |
|||||
4.N-1d, the City Engineer |
|||||
shall inform the Brisbane |
|||||