Significant Impact Being Mitigated |
Mitigation Measure |
Responsibility for Implementation |
Enforcement Responsibility |
Monitoring Responsibility/ Frequency |
Actions Indicating Compliance |
Traffic and Circulation (cont.) |
|||||
Increased traffic at |
4.N-1f: Prior to issuance of the building permit for an |
The arena operator shall |
City of Brisbane City |
The City Engineer shall |
Certificate of Occupancy for |
intersections causing |
arena within the Project Site, the arena operator shall |
prepare the required |
Engineer |
review the proposed |
the arena following approval |
them to operate |
develop a Transportation Management Plan (TMP) for |
Transportation Management |
Transportation |
of the required |
|
below acceptable |
coordination with the San Francisco Municipal |
Plan, and submit the plan to |
Management Plan and |
Transportation Management |
|
levels of service |
Transportation Agency (SFMTA), the San Francisco |
the Brisbane City Engineer, |
require any needed |
Plan. |
|
Existing plus Project |
Police Department, and the City of Brisbane, |
Brisbane Police |
modifications to the plan. |
||
conditions. |
developing incentives to increase transit ridership to |
Department, SFMTA, and |
The City Engineer shall |
||
DSP-V scenario |
the arena, and deploying traffic control officers at the unsignalized intersection of Blanken Avenue and |
the San Francisco Police Department for review and |
also confirm approval of the final plan by the |
||
Tunnel Avenue to approximate traffic control with traffic |
approval. |
Brisbane and San |
|||
signals of LOS C. Prior to issuance of a building occupancy permit for an arena within the Project Site, the City of Brisbane shall complete its review and approve the proposed TMP. |
The arena operator will also be responsible for implementing the requirements of the |
Francisco police departments and the SFMTA. The Public Works |
|||
approved Transportation |
Department shall monitor |
||||
Management Plan. |
implementation of the |
||||
Transportation |
|||||
Management Plan during |
|||||
Individual events at the |
|||||
arena. |
|||||
Increased traffic at |
4.N-1g: Approval of any tentative map providing for |
Applicant for any tentative |
City of Brisbane Planning |
The Brisbane City |
Tentative map approval in |
intersections causing |
spacing of less than 1,200 feet between full-access |
map providing for spacing of |
Commission |
Engineer shall review the |
compliance with Mitigation |
them to operate |
intersections along the Geneva Avenue extension shall |
less than 1,200 feet |
required microsimulation |
Measure 4.N-1g. |
|
below acceptable |
require that the interactions of green and red signal |
between full-access |
and require such revisions |
||
levels of service |
timing at any one intersection along the Geneva |
intersections along the |
as are needed to provide |
||
Existing plus Project |
Avenue extension shall not affect operations at any |
Geneva Avenue extension |
adequate operations at |
||
conditions. |
other intersection along the extension, by backing |
intersections along the |
|||
DSP, DSP-V, CPP, & CPP-V scenarios |
traffic waiting for a green signal at one intersection along the Geneva Avenue extension into another intersection along the extension. Should full-access |
Geneva Avenue extension prior to public hearings for the tentative map. |
|||
intersections along the Geneva Avenue extension with |
|||||
spacing of less than 1,200 feet be proposed, a |
|||||
microsimulation of all proposed intersections along the |
|||||
extension (e.g., Synchro, VISSUM) shall be undertaken |
|||||
to analyze interactions of green and red signal timing |
|||||
and demonstrate that operations at any one intersection |
|||||
along the Geneva Avenue extension would not affect |
|||||
operations at any other intersection along the extension. |
|||||