Mitigation Monitoring and Reporting Matrix (continued)

 

 

Significant Impact Being Mitigated

 

Mitigation Measure

 

Responsibility for Implementation

 

Enforcement Responsibility

Monitoring Responsibility/ Frequency

 

Actions Indicating Compliance

Traffic and Circulation (cont.)

Demand for loading

4.N-17: Each site-specific development project shall

Applicants for site-specific

City of Brisbane Building

The Building Official shall

Approval of site-specific

areas.

provide sufficient loading areas in appropriate locations

development projects.

Official

review all proposed site

development by the City in

DSP, DSP-V, CPP, &

CPP-V scenarios

such that loading activities, including loading vehicle queuing, will not block roadway or onsite parking area travel lanes, or bicycle or pedestrian facilities.

development plans to set requirements for the number of loading spaces

compliance with Mitigation Measure 4.N-17.

based on the proposed use

and anticipated levels of

loading activity.

The Community

Development Director shall

review all proposed site

development plans to

conform that the proposed

location and design of

loading activities, including

loading vehicle queuing, will

not block roadway or onsite

parking area travel lanes, or

bicycle or pedestrian

facilities.

Utilities, Service Systems, and Water Supply

Adequate local water

4.O-1a: The City shall issue building permits for

City Engineer

The Brisbane City Engineer

The City Engineer shall

Issuance of building permits

storage.

habitable structures only after it determines that

shall be responsible for

inform the Community

for habitable structures in

DSP, DSP-V, CPP, &

CPP-V scenarios

sufficient water storage is available and connected to

the Project Site’s water delivery system. Water storage facilities shall be constructed either by the Brisbane

ensuring that a site for construction of water storage facilities is identified and

Development Director and City Building Official when construction of needed

compliance with Mitigation Measure 4.O-1a.

Baylands developer or by the City, as mutually agreed.

facilities have been

water storage facilities has

Should the City construct facilities, site-specific

designed, all environmental

been completed.

development projects shall reimburse the City for their

studies and permits for such

fair share of costs, as determined by the City of

construction have been

Brisbane Public Works Department, for the

completed, and needed

development of water storage to provide fire flows and

water storage facilities have

peak daily water demands to serve Project Site

been constructed and

development. Prior to issuance of the first permit of

connected to the City water

occupancy, site-specific development projects shall

system.

verify the availability of adequate water storage

capacity to provide fire flows and meet peak daily water demands to serve Project Site development. Each required specific plan for development within the Project Site shall include this mitigation measure as a requirement for future development.

The City Building Official shall not issue any building permits for habitable structures without certification by the City