Significant Impact Being Mitigated |
Mitigation Measure |
Responsibility for Implementation |
Enforcement Responsibility |
Monitoring Responsibility/ Frequency |
Actions Indicating Compliance |
Traffic and Circulation (cont.) |
|||||
Demand for loading |
4.N-17: Each site-specific development project shall |
Applicants for site-specific |
City of Brisbane Building |
The Building Official shall |
Approval of site-specific |
areas. |
provide sufficient loading areas in appropriate locations |
development projects. |
Official |
review all proposed site |
development by the City in |
DSP, DSP-V, CPP, & CPP-V scenarios |
such that loading activities, including loading vehicle queuing, will not block roadway or onsite parking area travel lanes, or bicycle or pedestrian facilities. |
development plans to set requirements for the number of loading spaces |
compliance with Mitigation Measure 4.N-17. |
||
based on the proposed use |
|||||
and anticipated levels of |
|||||
loading activity. |
|||||
The Community |
|||||
Development Director shall |
|||||
review all proposed site |
|||||
development plans to |
|||||
conform that the proposed |
|||||
location and design of |
|||||
loading activities, including |
|||||
loading vehicle queuing, will |
|||||
not block roadway or onsite |
|||||
parking area travel lanes, or |
|||||
bicycle or pedestrian |
|||||
facilities. |
|||||
Utilities, Service Systems, and Water Supply |
|||||
Adequate local water |
4.O-1a: The City shall issue building permits for |
City Engineer |
The Brisbane City Engineer |
The City Engineer shall |
Issuance of building permits |
storage. |
habitable structures only after it determines that |
shall be responsible for |
inform the Community |
for habitable structures in |
|
DSP, DSP-V, CPP, & CPP-V scenarios |
sufficient water storage is available and connected to the Project Site’s water delivery system. Water storage facilities shall be constructed either by the Brisbane |
ensuring that a site for construction of water storage facilities is identified and |
Development Director and City Building Official when construction of needed |
compliance with Mitigation Measure 4.O-1a. |
|
Baylands developer or by the City, as mutually agreed. |
facilities have been |
water storage facilities has |
|||
Should the City construct facilities, site-specific |
designed, all environmental |
been completed. |
|||
development projects shall reimburse the City for their |
studies and permits for such |
||||
fair share of costs, as determined by the City of |
construction have been |
||||
Brisbane Public Works Department, for the |
completed, and needed |
||||
development of water storage to provide fire flows and |
water storage facilities have |
||||
peak daily water demands to serve Project Site |
been constructed and |
||||
development. Prior to issuance of the first permit of |
connected to the City water |
||||
occupancy, site-specific development projects shall |
system. |
||||
verify the availability of adequate water storage capacity to provide fire flows and meet peak daily water demands to serve Project Site development. Each required specific plan for development within the Project Site shall include this mitigation measure as a requirement for future development. |
The City Building Official shall not issue any building permits for habitable structures without certification by the City |
||||