2.
Response
to
Comments
2.9
Individual
Responses
to
Comments
from
Organizations
Football
League
venue,
is
approximately
0.5
mile
northeast
of
the
Brisbane
Baylands,
east
of
US
Highway
101.
Central
Brisbane
lies
directly
west
of
Brisbane
Lagoon,
separated
by
Bayshore
Boulevard.
Sierra
Point,
an
office/commercial/hotel
development
with
access
to
the
Brisbane
Marina,
lies
just
to
the
southeast
of
Brisbane
Lagoon
on
the
east
side
of
US
Highway
101.
Caltrain,
a
major
commuter
line
connecting
San
Francisco
with
communities
in
the
Peninsula
region
and
San
Jose,
has
tracks
that
bisect
the
Brisbane
Baylands,
with
the
nearest
Caltrain
station
(Bayshore
Station)
located
at
the
northern
end
of
the
Baylands.
The
Brisbane
Fire
Station
(Station
Number
81),
operated
by
the
North
County
Fire
Authority,
is
located
on
Bayshore
Boulevard
just
outside
of
the
southwestern
edge
of
the
Project
Site.
OSEC-16
[See page
5-307 for the original comment]
Figure
3-3
identifies
topography
for
the
Baylands
Project
site,
which
does
not
extend
to
or
beyond
the
San
Francisco
Bay
shoreline.
No
revisions
to
that
figure
are
therefore
needed.
[See page
5-307 for the original comment]
The
portions
of
the
Baylands
Project
site
within
the
former
landfill
were,
in
fact,
filled
prior
to
the
dates
shown
on
Figure
3-4.
Since
the
dates
that
the
Bay
was
filled
are
accurately
described
in
the
Section
3.2.1
of
the
Draft
EIR,
Site
History
,
Figure
3.4
is
unnecessary,
and
is
deleted
from
the
EIR.
[See page
5-307 for the original comment]
The
four
maps
shown
in
Figure
3-5
were
extracted
from
U.S.
Geological
Survey
maps,
specifically
the
San
Mateo
quadrangle,
15-minute
series.
This
information
is
provided
at
the
bottom
of
the
figure
under
“Source.”
[See page
5-307 for the original comment]
See
Master Response 13
for
discussion
of
the
adequacy
of
existing
hazardous
materials
characterization
studies
for
use
in
the
Draft
EIR.
Any
contamination
from
the
facility
identified
in
this
comment
would
be
included
in
the
hazardous
materials
studies
undertaken
for
the
Baylands
Project
Site.
[See page
5-307 for the original comment]
See
Master Response
9
for
discussion
regarding
identification
of
wetlands
within
the
Baylands
Project
site.
The
frog
habitat
referred
to
in
Comment
OSEC-20
was
not
observed
during
the
numerous
site
surveys
conducted
in
2003,
2007,
2011,
and
2013
by
various
professional
individuals
and
consulting
firms.
[See page
5-307 for the original comment]
The
Brisbane
Bayshore
Industrial
Park
is
specifically
identified
and
described
on
page
3-17.
Since
buildings
within
the
industrial
park
are
proposed
to
be
removed
during
site
construction
under
all
OSEC-17
OSEC-18
OSEC-19
OSEC-20
OSEC-21
Brisbane
Baylands
Final
EIR
2.9.3-10
May
2015
Previous Page | Next Page