These noise levels shall be attained through use of appropriate building materials as required by state of California Title 24 standards. Compliance with these performance standards shall be verified by an acoustical professional prior to issuance of a building permit. Specific measures to achieve these performance standards shall include all or any combination of the following options:
|
|
|
The City Building Official shall also be responsible for monitoring site construction to ensure that the development features proposed by the applicant to meet applicable performance standards are constructed as approved. |
|
Exposure of hotel uses within the Baylands to noise levels in excess of City standards. DSP, DSP-V, CPP, & CPP-V scenarios |
Mitigation Measure 4.J-1b: All hotel projects within the Project Site shall minimize the exposure of people within the Project Site to noise from Caltrain operations through construction of noise barriers or maintenance of buffer distances, and shall adhere to the following noise performance standards:
These noise levels shall be attained through use of appropriate building materials as required by state of California Title 24 standards. Compliance with these performance standards shall be verified by an acoustical professional prior to issuance of a building permit. Specific measures to achieve these performance standards shall include all or any combination of the following options: |
Applicant(s) for hotel development shall provide a noise analysis prepared by an acoustical professional verifying that the performance standards set forth in Mitigation Measure 4.J-1a will be achieved. |
City of Brisbane Building Official |
Prior to issuing any building permit(s) for hotel development, the City Building Official shall review the noise analysis prepared for the applicant by an acoustical professional to ensure that the performance standards set forth in Mitigation Measure 4.J-1a will be achieved. The City Building Official shall also be responsible for monitoring site construction to ensure that the development features proposed by the applicant to meet applicable performance standards are constructed as approved. |
Issuance of building permit(s) for hotel development in compliance with Mitigation Measure 4.J- 1b. |