Significant Impact Being Mitigated |
Mitigation Measure |
Responsibility for Implementation |
Enforcement Responsibility |
Monitoring Responsibility/ Frequency |
Actions Indicating Compliance |
Traffic and Circulation (cont.) |
|||||
Increased traffic at intersections causing |
4.N-3b:4At the signalized intersection of Old County Road & Bayshore Boulevard,5the eastbound approach |
Baylands developer |
City of Brisbane City Engineer |
The City Engineer shall maintain annual traffic |
Installation of the physical improvements required by |
them to operate |
shall be restriped to create one additional exclusive |
counts to monitor traffic |
Mitigation Measure 4.N-3b. |
||
below acceptable |
through lane. In addition, the southbound approach |
conditions, and shall |
|||
levels of service |
shall be restriped to create two additional lanes: an |
provide for traffic analyses |
|||
Cumulative plus |
added exclusive left-turn pocket and an added through |
of site-specific |
|||
Project conditions. |
lane for the southbound approach. Eastbound Tunnel |
development proposals to |
|||
DSP, DSP-V, CPP, & CPP-V scenarios |
Avenue shall be widened to the east of its existing alignment to accommodate two receiving lanes for the southbound left and eastbound through traffic. These |
determine when the requirements of Mitigation Measure 4.N-3b are to be |
|||
improvements shall be constructed and accepted for |
applied. |
||||
public maintenance prior to issuance of occupancy permits for any site-specific development that would (1) result in reducing the intersection to below the acceptable LOS standard, or (2) contribute additional traffic to the intersection if it is already operating below the acceptable LOS standard. |
If the requirements of Mitigation Measure 4.N-3b are apply to the site- specific development, the City Engineer shall inform the City Building Official, |
||||
who shall not issue |
|||||
occupancy permits for the |
|||||
development until notified |
|||||
by the City Engineer that |
|||||
the required improvements |
|||||
have been completed. |
|||||
Increased traffic at |
4.N-3c: Installation of a traffic signal at the intersection |
Baylands developer |
City of Brisbane City |
The City Engineer shall |
Installation of the physical |
intersections causing |
of Sierra Point Parkway and the US 101 freeway |
Engineer |
maintain annual traffic |
improvements required by |
|
them to operate |
ramps shall be required when the peak hour signal |
counts to monitor traffic |
Mitigation Measure 4.N-3c. |
||
below acceptable |
warrant is met in the AM or PM peak hour. The signal |
conditions, and shall |
|||
levels of service |
shall be shall be constructed and accepted for public |
provide for traffic analyses |
|||
Cumulative plus |
maintenance prior to issuance of occupancy permits |
of site-specific |
|||
Project conditions. |
for any site-specific development that would cause |
development proposals to |
|||
DSP, DSP-V, CPP, & CPP-V scenarios |
signal warrants to be met in the AM or PM peak hour. |
determine when the requirements of Mitigation Measure 4.N-3c are to be |
|||
applied. |
|||||
4Mitigation Measure 4.N-1b provides for mitigation of Project Site development-related impacts in the Existing plus Project condition, while this mitigation measure provides for mitigation in the Cumulative With Project condition. This mitigation measure is based on needed modification to the existing, baseline configuration of the intersection, and does not assume that Mitigation Measure 4.N-1b is implemented.
5Existing Bayshore Boulevard at Old County Road is approximately 80 feet wide and includes two through lanes for each direction and a median. Dedicated right-turn yield lanes are currently provided at all four approaches.