Significant Impact Being Mitigated |
Mitigation Measure |
Responsibility for Implementation |
Enforcement Responsibility |
Monitoring Responsibility/ Frequency |
Actions Indicating Compliance |
Traffic and Circulation (cont.) |
|||||
Increased traffic at |
4.N-3e: A traffic signal shall be installed when the peak |
Baylands developer |
City of Brisbane City |
The City Engineer shall |
Installation of the physical |
intersections causing |
hour signal warrant is met in either the AM or PM peak |
Engineer |
maintain annual traffic |
improvements required by |
|
them to operate |
period. In addition, the Lagoon Way/Sierra Point |
counts to monitor traffic |
Mitigation Measure 4.N-3e. |
||
below acceptable |
Parkway intersection shall be widened and intersection |
conditions, and shall |
|||
levels of service |
approaches shall be restriped to provide two through |
provide for traffic analyses |
|||
Cumulative plus |
lanes and one right-turn lane in the southbound |
of site-specific development |
|||
Project conditions. |
direction, one through lane and two left-turn lanes in |
proposals to determine |
|||
DSP, DSP-V, CPP, & CPP-V scenarios |
the northbound direction, and two left-turn lanes and one right-turn lane in the eastbound direction. Additional road widening on Lagoon Road & Sierra |
when the requirements of Mitigation Measure 4.N-3e are to be applied. |
|||
Point Parkway would also be required. The signal shall be constructed and accepted for public maintenance prior to issuance of occupancy permits for any site- specific development that would cause signal warrants to be met in the AM or PM peak hour. The other improvements cited in this measure shall be constructed and accepted for public maintenance prior to issuance of occupancy permits for any site-specific development that would (1) result in reducing the intersection to below the acceptable LOS standard, or (2) contribute additional traffic to the intersection if it is already operating below the acceptable LOS standard. |
If the requirements of Mitigation Measure 4.N-3e are apply to the site-specific development, the City Engineer shall inform the City Building Official, who shall not issue occupancy permits for the development until notified by the City Engineer that the required improvements have been completed. |
||||
Increased traffic at |
4.N-3f: The City of Brisbane shall work with the San |
City of Brisbane City |
The City Engineer shall |
The City Engineer shall |
Issuance of building permits |
intersections causing |
Francisco County Transportation Authority (SFCTA), |
Engineer |
provide updated information |
review any updates to the |
following payment of |
them to operate |
San Francisco Municipal Transportation Authority |
on the approved buildout of |
Bi-County Transportation |
applicable mitigation and |
|
below acceptable |
(SFMTA), and Caltrans to ensure that projected traffic |
the Baylands to the SFCTA, |
Study effort to ensure that |
fair share funding |
|
levels of service |
volumes are accounted for in the design of the Geneva |
SFMTA, and Caltrans to |
updated information on the |
requirements for Bi-County |
|
Cumulative plus |
Avenue & US 101 SB Ramps intersection as part of |
ensure that projected traffic |
approved buildout of the |
Transportation Study |
|
Project conditions. |
the Geneva Avenue extension project. |
volumes are accounted for |
Baylands is reflected in the |
improvements. |
|
DSP, DSP-V, CPP, & CPP-V scenarios |
Mitigations and associated fair-share funding measures for cumulative regional roadway system impacts will be formulated through the current inter- jurisdictional Bi-County Transportation Study effort being led by the SFCTA. Development within the |
in the design of the Geneva Avenue & US 101 SB Ramps intersection as part of the Geneva Avenue extension. |
update. |
||
Project Site shall contribute its fair share to the Geneva |
Once mitigation and fair |
||||
Avenue & US 101 SB Ramps intersection and |
share funding requirements |
||||
improvements. |
are established, the City |
||||
The extension of Geneva Avenue from Bayshore Boulevard to the US 101 freeway and reconfiguration of the US 101 Candlestick interchange shall be |
Engineer shall include such requirements as conditions of approval for site-specific development. |
||||