Significant Impact Being Mitigated |
Mitigation Measure |
Responsibility for Implementation |
Enforcement Responsibility |
Monitoring Responsibility/ Frequency |
Actions Indicating Compliance |
Traffic and Circulation (cont.) |
|||||
|
constructed and accepted for public maintenance prior to issuance of occupancy permits for any site-specific development that would result in reducing the interchange to below the acceptable LOS standard. |
|
|
|
|
Increased traffic at |
4.N-3g: Prior to issuance of occupancy permits for any |
Baylands developer |
City of Brisbane City |
The City Engineer shall |
Installation of the physical |
intersections causing |
site-specific development that would (1) result in |
Engineer |
maintain annual traffic |
improvements required by |
|
them to operate |
reducing the intersection to below the acceptable LOS |
counts to monitor traffic |
Mitigation Measure 4.N-3g |
||
below acceptable |
standard, or (2) contribute additional traffic to the |
conditions, and shall |
or written confirmation from |
||
levels of service |
intersection if it is already operating below the |
provide for traffic analyses |
San Francisco that such |
||
Cumulative plus |
acceptable LOS standard, signal timing settings at the |
of site-specific |
improvements will not be |
||
Project conditions. |
Carter Street/Geneva Avenue intersection shall be |
development proposals to |
permitted to be constructed. |
||
DSP, DSP-V, CPP, & CPP-V scenarios |
modified by the City and County of San Francisco to provide longer green time on eastbound/westbound permitted movements and longer cycle length. |
determine when the requirements of Mitigation Measure 4.N-3g are to be |
|||
applied. |
|||||
If the requirements of |
|||||
Mitigation Measure 4.N-3g |
|||||
apply to a site-specific |
|||||
development, the City |
|||||
Engineer shall inform the |
|||||
City Building Official, who |
|||||
shall not issue occupancy |
|||||
permits for the |
|||||
development until notified |
|||||
by the City Engineer that |
|||||
the requirements of |
|||||
Mitigation Measure 4.N-3g |
|||||
have been satisfied. |
|||||
Because the required |
|||||
improvements are outside |
|||||
of Brisbane, permission to |
|||||
construct the |
|||||
improvements called for in |
|||||
Mitigation Measure 4.N-3g |
|||||
must be secured from the |
|||||
City and County of San |
|||||
Francisco. The City |
|||||
Engineer shall work with |
|||||
the applicant to secure |
|||||
such permission. |
|||||