Significant Impact Being Mitigated |
Mitigation Measure |
Responsibility for Implementation |
Enforcement Responsibility |
Monitoring Responsibility/ Frequency |
Actions Indicating Compliance |
Traffic and Circulation (cont.) |
|||||
|
vehicle entrance to and exit from the arena site, as well |
The arena operator will also |
|
departments and the |
|
as maintain orderly traffic operations and prevent turning |
be responsible for |
SFMTA. The Public Works |
|||
movements that would intrude onto minor routes to and |
implementing the |
Department shall monitor |
|||
from the arena. Traffic control officers shall be provided |
requirements of the |
implementation of the |
|||
on event dates to, at a minimum, facilitate traffic flow at |
approved Transportation |
Transportation |
|||
the intersection of Valley Drive & Bayshore Boulevard, |
Management Plan. |
Management Plan during |
|||
which would otherwise operate at LOS E conditions |
Individual events at the |
||||
without manual traffic control by officers at the |
arena. |
||||
intersection with a sold-out arena event. Preparation and |
|||||
implementation of the plan shall be fully funded by the |
|||||
arena operator and shall be completed to the |
|||||
satisfaction of the City prior to opening day of the arena. |
|||||
Increased transit |
4.N-7: Prior to issuance of the first building occupancy |
Baylands developer |
In consultation with the |
Monitoring responsibility |
Issuance of the first |
ridership and |
permit for new development other than improvement of |
SFMTA, the City Engineer |
shall be as established in |
certificate of occupancy for |
|
impacts on Muni |
relocation of an existing use within the Project Site, the |
shall determine a fair share |
the required conditions of |
new development other |
|
operations. |
developer(s) of Project Site land uses shall provide a |
formula to be used for |
approval. |
than improvement or |
|
DSP, DSP-V, CPP, & CPP-V scenarios |
fair-share contribution to the San Francisco Municipal Transportation Agency (SFMTA) to cover Baylands development’s share of the capital costs for providing |
implementation of Mitigation Measure 4.N-7. Once fair share funding requirements |
relocation of an existing use within the Baylands following payment of fair |
||
additional transit service needed to achieve San |
are established, the City |
share funding to the |
|||
Francisco Muni’s capacity threshold of 85 percent along |
Engineer shall include such |
SFMTA. |
|||
the Northeast and Southeast screenlines. In addition, |
requirements as conditions |
||||
provision shall be made for implementation of shuttle |
of approval for site-specific |
||||
service between the Project Site and the Balboa Park |
development. |
||||
BART Station in the Geneva Avenue corridor. |
|||||
Adequacy of transit |
4.N-9: Prior to issuance of the first building occupancy |
Applicants for specific |
Specific Plan(s): City |
The Community |
Shuttle bus operation |
service (areas of site |
permit for any new development other than |
plan(s) shall include the |
Council |
Development Director shall |
pursuant to the approved |
more than 1/3 miles from Caltrain and Muni T-line stations). DSP, DSP-V, CPP, & CPP-V scenarios |
improvement or relocation of an existing use within the Project Site, a shuttle bus service plan shall be developed and approved by the City that provides convenient transit service (maximum 15 minute headways in the peak hour) between Project Site land uses within the Baylands located more than one-third mile from the Bayshore Caltrain Station or Sunnydale Muni Station to those stations. Shuttle service shall be implemented as described in the plan prior to occupancy of any qualifying Project Site land use other than improvement or relocation of an existing use within the Project Site. |
required language in proposed specific plans, including timing for implementation of the service and establishment of needed funding of capital costs and ongoing operations and maintenance. The Baylands developer shall be response for preparation of the required |
The City shall not adopt any specific plan or approve any site-specific development project that would does not meet the requirements of Mitigation Measure 4.N-9. |
review the required specific plan language for compliance with Measure 4.N-9 prior to public hearings on the specific plan. Prior to the first building permit, the Community Development Director shall review the proposed shuttle bus plan and require any needed modifications to be |
shuttle bus operations plan. |
This requirement shall also be included in any specific |
shuttle bus service plan. |
completed by the Baylands |
|||
plan approved for development within the Project Site. |
developer. |
||||